Things are finally coming together at the new location for my client. The server room is already at the point where I could bring in three of the four racks being installed. The fourth rack is in production and cannot be moved until the day of the move. The racks are attached with special bars that lock the units together. The racks had to be brought in so the electricians could drop down the power drops to the units and also ground the racks. The wiring and telecom guys should be dropping their lines into the racks starting next week.